Karo Platinum is the latest PGM asset under construction on Zimbabwe’s renowned Great Dyke combining a low cost, 10-year open cast phase with a longer, 30 year + underground phase. Project returns will be further enhanced should current studies to utilise the base metal reef, rich in copper, nickel and cobalt, yield positive results.
The Karo project is a joint venture between Karo Mining Holdings (85%) and Generation Minerals (15%), a Republic of Zimbabwe Special Purpose Vehicle (SPV).
OUR VISION AND VALUES